Village of Point Venture

Home
Applicable Ordinances
BC Meeting Agenda
ACC Meeting Agenda

Building Commission
& Point Venture Architectural Control Committee
buildingcommission@vopv.org

Builders Packet
Revised 09/05/07

The construction or modifications of buildings and improvements on real property in the Point Venture residential community is governed and regulated by the Village of Point Venture (the “Village”) and the Declarations of Covenants, Conditions and Restrictions applicable to each such property (collectively, the “Deed Restrictions”).  All Village Ordinances relating to construction and building structures are administered and enforced by the Village Building Commission (the “BC”).  The Point Venture Architectural Control Committee (the “Point Venture ACC”) is the designated authority under the Deed Restrictions for review and approval of proposed new construction as well as additions and alterations to structures in the Point Venture residential community.  The BC and Point Venture ACC are separate entities and you must obtain the necessary permits and approvals from both prior to beginning any construction activity. 

This packet is provided to assist you with the process of submitting plans to and obtaining the required permits and approvals from the BC and Point Venture ACC.  The information and forms included within this packet include:

Building Commission:

  1. Building Commission – Building Guidelines
  2. Building Commission – Requirements for Remodeling, Additions, and Revisions to Existing Homes
  3. Basic Development Building/Remodeling Permit Application
  4. Floodplain Development Permit Application
  5. Floodplain Acknowledgment
  6. Construction Inspection Requirements
  7. Silt Fencing Requirements
  8. Culvert Requirements
  9. Fee Schedule
  10. General Contractor’s Cash Bond Refund Request & Final Inspection Report for Certificate of Occupancy
  11. Notice – Noise Control
  12. BC Checklist for Plan Submittal
  13. BC Plan Submittal Record
  14. Warning Notice
  15. Notice to Builders/Owners 

Point Venture ACC:

  1. ACC Guidelines
  2. Fencing Guidelines
  3. ACC Plan Submittal

Other

  1. Mailbox Requirements
  2. Point Venture Rules & Information
  3. Procedures for Receiving a Certificate of Occupancy
  4. Building on a Lot Located in the Floodplain

   
The information and documents provided in this packet are subject to change or revisions, and you need to recheck with the BC and Point Venture ACC for updates to this packet before submitting plans to avoid any delay caused by an incomplete submittal. 

All information and documents required for submission of plans to the BC and Point Venture ACC should be delivered to the BC at __________________________ and to the Point Venture ACC at ____________________.

 

Additionally, if you have any questions or need additional information from either the BC or Point Venture ACC, you may contact any of the members of the respective entity.  The contact information for the members of both the BC and the Point Venture ACC is:


POINT VENTURE BUILDING COMMISSION

549 Venture Blvd. S.

Point Venture , TX   78645

Phone (512) 267-5511  Fax (512) 267-1245 Email: buildingcommission@vopv.org

 

Members:

 

Ron Hruby                              Home:     (512)-267-9219                       Carole Hanson                                        Home:     (512)-267-4088

18624 Lakeland Drive                                                                              18918 Venture Drive

 

Hank Riemer, Jr.                     Home:     (512) 267-7597                       Bob Adolph                                            Home:     (512)-267-7576

704 Deckhouse Drive                                                                             206 Pinehurst Circle

                                                                                                                                                                                                                                               

Earnest Godsey                               Home:                         

Courtney Waters, Field Operations Manager                        Office: 267-5511

 

 

POINT VENTURE ARCHITECTURAL CONTROL COMMITTEE

549 Venture Blvd. S.

Point Venture , TX   78645

Phone (512) 267-5511  Fax (512) 267-1245 Email: buildingcommission@vopv.org

 

Members:

Ron Hruby                              Home:     (512)-267-9219                       Carole Hanson                                        Home:     (512)-267-4088

18624 Lakeland Drive                                                                              18918 Venture Drive

 

Hank Riemer, Jr.                     Home:     (512) 267-7597                       Bob Adolph                                            Home:     (512)-267-7576

704 Deckhouse Drive                                                                             206 Pinehurst Circle

                                                                                                                                                                                                                                               

Ernest Godsey                               Home: